Destination 339 Tenant Improvement in Camas, WA

Book a Free Walkthrough Call (360) 326-2747

Modern Northwest built the Destination 339 tenant improvement at 339 NE Cedar Street in downtown Camas, Washington. The work was finished in 2025.

Built by Modern Northwest, licensed in Oregon (CCB #198582) and registered in Washington (L&I MODERNI888R7) since 2012, from our office at 19140 NE Portal Way, Portland.

Corner building at 339 NE Cedar Street in downtown Camas, home of Destination 339
The building on NE Cedar Street.

Project facts

ClientDestination 339
Location339 NE Cedar St, Camas, WA
Project typeTenant improvement
Built2024 to 2025

What we built

The space is a long, open room in a corner building in downtown Camas. The finished room has long bar counters, brick and wood walls, an open ceiling with exposed ducts and string lights, and storefront glass at the end of the room.

Downtown buildings come with their own limits: older structure, tight access, and neighbors on both sides. Our Washington page covers how we permit and build tenant improvements in Clark County.

The job ran on two levels, built from 2024 to 2025: about 5,000 square feet of ground-floor event space with a commercial kitchen, and about 5,000 square feet of basement, dug out and built as a Sunday school, with a new elevator between the two. The trades on the job were framing and interiors, electrical, an elevator, HVAC, fire alarm, fire sprinklers, flooring, plumbing, painting, finish carpentry, roofing, sliding doors, tile, catering cabinets, door hardware, and EIFS on the outside of the building.

What the permit covered

The City of Camas permit, BLDC-24-1003, was issued on July 9, 2024 and names Modern Northwest Inc as contractor. It covers a tenant improvement with a partial change of occupancy, and its scope includes a new elevator and an extensive basement remodel. So what looks like a single ground-floor room from the sidewalk was a job on more than one level of the building.

The elevator

By November 4, 2024 the elevator pit was lined out so the car could travel to the first floor, with the east interior wall of the pit set 1-1/8 inches outside the glulam beam for attachments. The elevator inspection came in August 2025, and it called for a change to the sump pump piping above the grate: a union joint, a ball valve, and pipe in schedule 80 or copper.

What was on each level

Our project manager puts it at about 5,000 square feet on the ground floor, the event space with its commercial kitchen, and about 5,000 square feet in the basement, which became a Sunday school. The old basement was dug out, the soil and concrete carried up the stairwell, and the school was built in its place with new walls, floors, an office, an open area, a kitchenette and classrooms. The elevator ties the two levels together.

The basement had been an old brewery. About a hundred yards of soil and concrete came out of it through the stairwell, and the stairway itself was rebuilt. The elevator company brought the car in pieces and assembled it on site, in a shaft built for it with a concrete pit for the mechanicals.

What it became

The space now runs as an event venue. Its listing describes about 2,000 square feet with a newly renovated open floor plan, two large sliding glass doors to the sidewalk, a gated patio, two jumbo screens, zoned speakers including the restrooms, and wheelchair access. The basement has restrooms too. Flooring, paint and slider track covers were being finished in July 2025.

By the numbers

Sixteen subcontracts. Our logs show 564 crew hours between July 15, 2024 and August 26, 2025.

Bar counter and open room during the Destination 339 build-out in Camas
The bar counter and open room, near the end of construction.
Long bar counter with brick wall at Destination 339 in Camas
The long counter and brick wall.
Long open room with wood-clad wall and storefront at Destination 339 in Camas
Looking down the room toward the storefront.

Questions about this project

Did this job include an elevator?

Yes. The City of Camas permit covers a new elevator and an extensive basement remodel. The elevator runs between the ground-floor event space and the basement school, about 5,000 square feet on each level.

How many trade contracts did the job have?

Sixteen subcontracts, including an elevator, roofing and EIFS on the outside of the building.

What is the space used for now?

It runs as an event venue, listed at about 2,000 square feet with sliding glass doors to the sidewalk and a gated patio.

What was in the basement before?

An old brewery. We dug it out, carried the soil and concrete up the stairwell, and built the Sunday school in its place.

Related services

WashingtonTenant Improvement

See all of our work

Planning a Tenant Improvement in Clark County?

Reach out for a free consultation. One project manager runs your job from start to finish.

Get a free estimate

Tell us about the space. Size and timeline are optional.

Call UsFree Estimate