Ground-Up Construction in Portland, Oregon

4.9 ★ on GoogleLicensed in Oregon (CCB #198582) and registered in Washington (L&I MODERNI888R7)OR licensed, WA registered since 2012

“Exceeded our expectations.” Animal Care Center Veterinary Clinic, Salem, clinic renovation

“Professional, competitively priced, with excellent communication.” MK Phelps, primary care clinic build-out

Ground Up & Development by Modern Northwest, commercial contractor in Portland, OR
Ground Up & Development

Modern Northwest builds new buildings from bare ground across the Portland metro and Southwest Washington: commercial buildings, clinics, metal buildings, apartments and mixed-use. Ground-up work starts long before the foundation. The site has to be graded, drained and connected to water, sewer and storm, the street in front often has to be improved, and the city has to approve all of it before the building permit means anything. We run the whole thing, from the first site visit to the certificate of occupancy.

New Buildings We Have Built and Are Building

  • 2465 NE Alberta St, Portland: a 4-story mixed-use building, finished August 2026.
  • 55th Apartments, NE 55th Ave, Portland: a 16-unit apartment building, finished March 2025.
  • 46th Townhomes, NE 46th Ave, Portland: two new 6-unit townhome buildings, finished in 2024.
  • 73rd fourplex, SE 73rd Ave, Portland: a 4,045 square foot new fourplex, finished July 2025. Each unit is two stories, bedrooms up and an open kitchen, dining and living room down.
  • Webster Apartments, N Webster St, Portland: our first multifamily build, a 16-unit, 3-story apartment building with a small lobby at the main entrance.
  • Under construction: a 10,000 square foot ground-up eye clinic for EyeHealth Northwest in Aloha, with full site development, a parking lot and off-site improvements, and a 10,000 square foot metal building with full site development for EquipmentShare on NE Cherry Drive in Hillsboro.

What a Ground-Up Job Includes

Site Feasibility

Before you buy or design, we look at the lot: access, slope, soils, where water, sewer and storm connect, and what the zoning allows. Those decide the budget more than the building does.

Site Development

Clearing, grading, drainage, utilities and parking. On the EyeHealth Northwest clinic in Aloha and the EquipmentShare building in Hillsboro, the site development is a full phase of the job on its own.

Off-Site Improvements

Cities often require work outside your property line: sidewalks, curbs, driveway approaches and utility extensions in the street. It is priced and permitted separately, so we flag it early.

Foundation and Shell

Footings, slab, structure, roof and exterior walls. For a pre-engineered metal building the steel package is ordered early, because it sets the schedule.

Interiors and Turnover

Mechanical, electrical, plumbing and finishes, then the final inspections and the certificate of occupancy that lets you move in.

Housing and Mixed-Use

Apartments, townhomes and mixed-use buildings, like the 4-story building on NE Alberta. See our multifamily construction page and our guide to mixed-use construction.

Get a free estimate for your ground up & development project

Tell us what you are planning. Size and timeline are optional.

The Costs That Surprise New-Building Owners

System development charges and impact fees. Cities charge them on new buildings and on changes of use, and they are usually due before the permit is issued. Gresham calculates SDCs during plan review, and Camas collects plan review fees, impact fees and SDCs before issuing a permit (per the Gresham and Camas city websites; see our Gresham and Camas pages). We put them in the budget at the start, not as a surprise at permit time.

Public works review. Gresham, for example, has streets, water, sewer, storm, parks and fire review the plans alongside the building review. Every comment from those reviewers can change the site plan, so we design the site with them in mind.

The street in front of the lot. Frontage and off-site improvements can be a real share of a small project. On a tight lot they can decide whether the project works at all, which is why we walk the site before you commit.

How long does commercial construction take?

55th Apartments in Portland, a 16-unit building Modern Northwest built from the ground up
Real Projects

55th Apartments, Portland

A new 16-unit apartment building on NE 55th Ave, built in 2024, finished March 2025.

See Our Work

How a Ground-Up Project Runs

01

Walk the Site

Access, slope, utilities and the street frontage, before you buy or design.

02

Budget and Schedule

A real budget including fees, site work and off-site improvements, and a schedule built around the city review. See preconstruction.

03

Design and Permits

Land use and site review where needed, then the building permit with Portland Permitting & Development or your city.

04

Site Work, Then the Building

Grading, utilities and foundations first, then the shell, then the interiors, with inspections at every stage.

05

Certificate of Occupancy

Final inspections across every discipline, then the certificate of occupancy that lets you open.

Ground-Up Construction Questions, Answered

What is ground-up construction?

Building a new structure on a vacant or cleared lot, starting with site work and foundations, instead of remodeling or fitting out a building that already stands. Our ground-up work includes a 4-story mixed-use building on NE Alberta and the 16-unit 55th Apartments in Portland.

What kinds of new buildings do you build?

Commercial buildings and clinics, pre-engineered metal buildings, apartments, townhomes and mixed-use buildings, across the Portland metro and Southwest Washington.

What are off-site improvements?

Work the city requires outside your property line, like sidewalks, curbs, driveway approaches and utility extensions. They are part of many ground-up jobs, including the EyeHealth Northwest clinic in Aloha.

Do I pay system development charges on a new building?

Usually, yes. Cities charge SDCs or impact fees on new buildings, and they are often due before the permit is issued. We include them in the budget from the start.

Can you build a metal building?

Yes. We are building a 10,000 square foot metal building with full site development for EquipmentShare in Hillsboro.

Have you built new buildings in Portland?

Yes. A 4-story mixed-use building on NE Alberta, the 16-unit 55th Apartments, two 6-unit townhome buildings on NE 46th and a fourplex on SE 73rd.

Serving the Portland metro, including Portland, OR, Beaverton, OR, and Vancouver, WA. See our full service areas in Oregon and Washington.

Planning a New Building?

Send us the site address. We will walk it with you and tell you what the land, the city and the street will ask for.