Zaiqa Indian Cuisine Restaurant Build-Out in Ridgefield, WA
Book a Free Walkthrough Call (360) 326-2747
Modern Northwest built out a 2,068 square foot restaurant for Zaiqa Indian Cuisine in a retail center on Royle Road in Ridgefield, Washington. The work started in November 2025 and finished in September 2026.

Project facts
| Client | Zaiqa Indian Cuisine |
| Location | 536 S Royle Rd, Ridgefield, WA |
| Size | 2,068 sq ft |
| Project type | Restaurant tenant improvement |
| Finished | September 2026 |
What we built
The finished room has a dining area with booths and tables, a long counter with stools, wood shelving for wine and dishes, a service station, and a kitchen behind a pass-through.
A restaurant build-out carries more trades than most suites. On this job they were mechanical and gas, electrical, metal stud framing, insulation, drywall, ceilings and FRP wall panels, fire sprinklers, custom casework, plumbing, grind and seal floors, bath accessories, painting, and LVT flooring with rubber base. Our restaurant construction page covers the code and kitchen work behind a build-out like this.
The range hood
The range hood took real coordination on this restaurant. The approvals included range hood drawings and a separate structural engineering and layout package for the hood, and one of the two field questions was about coordinating the hood, the mop sink and the water heater. A walk-in cooler and the plumbing fixtures also went through approval before install.
The job ran as construction management at risk.
The restaurant
Zaiqa describes itself as a family-owned Indian-Pakistani restaurant, with halal-certified meats and sauces, chutneys and spice blends made in-house daily. Its own site lists Ridgefield as a new location, alongside Lake Oswego and South Waterfront. What Now Portland reported the Ridgefield expansion in September 2025.






Questions about this project
How big is Zaiqa Indian Cuisine?
2,068 square feet, at 536 S Royle Road in Ridgefield, Washington.
What delivery method did the restaurant use?
Construction management at risk.
When did the Zaiqa build-out finish?
In September 2026. The work started in November 2025.
Related services
Planning a Restaurant Build-Out?
Reach out for a free consultation. One project manager runs your job from start to finish.
