Guide

Who Is Responsible for Pulling Permits? Contractor vs. Owner in Portland, Beaverton & Vancouver WA

By Erik Tishenko, Modern Northwest · Published July 23, 2026

In nearly every case, your general contractor pulls the building permit under their own contractor license. But the property owner is the one legally responsible for making sure a permit exists before work starts, and in most cases the owner can apply for the permit directly instead of the contractor. For the local steps, see Portland commercial permits, Clark County commercial permits and Washington County permits.

We build on both sides of the river. In Camas we built the Journey Church and Destination 339 tenant improvements, in Washougal the 20,000 square foot Rite Aid to Ace Hardware conversion, and in Hillsboro the 5,618 square foot Orenco Family Medicine clinic. Oregon CCB #198582, Washington MODERNI888R7. Call (360) 326-2747 or ask us about your permit.

JurisdictionQuick answer
Portland / Multnomah CountyContractor or owner, CCB number required for hired work
Washington County (Beaverton, Hillsboro, Tigard)Same Oregon CCB framework, city vs. county depends on your address
Vancouver, WAApplicant and property owner both sign the application

The quick-reference version. Full detail, sources, and the complete jurisdiction table below.

Commercial tenant improvement construction by Modern Northwest, permitted and built across the Portland metro
Every Modern Northwest project, tenant improvement or ground-up, starts with the right permit filed in the right jurisdiction.

That single rule plays out differently depending on which city or county your project sits in. Here's how it actually works across the Portland metro.

The general rule: contractor pulls it, owner is on the hook

Two things are both true at the same time. The property owner is ultimately responsible for confirming every required permit is in place, in every jurisdiction, before construction starts. In practice, the general contractor is almost always the one who files the application, because the process asks for a licensed contractor's registration number and the GC is the one coordinating plans, subcontractors, and inspections.

Oregon's contractor law, ORS 701.010, exempts from Construction Contractors Board (CCB) licensing an owner who hires licensed contractors to do the work, and a person working on property they own or working as the owner's employee. The exemption does not apply when the work is done as a business with the intent to sell the structure. In Washington, Vancouver's commercial permit application lists both an applicant signature and a property owner signature under "Required Signatures."

Whoever signs the application is the "applicant," and that's who the city or county contacts for corrections, questions, and inspection scheduling.

Portland & Multnomah County

Portland's Permitting & Development bureau doesn't require the applicant to be the contractor. Their own guidance states the applicant is simply who they should contact about the permit, and asks for the contractor's CCB number, or "Owner doing work" if the property owner is self-performing.

One nuance that trips up property managers who own buildings outside city limits: Multnomah County issues its own building permits, but only for unincorporated areas of the county, outside any city. If your building sits inside Portland, Gresham, Fairview, Troutdale, or Wood Village, the permit goes through that city's own building department, not the county, even though the property sits in Multnomah County.

Washington County (Beaverton, Hillsboro, Tigard)

Washington County runs its own Building Services division for unincorporated county land, separate from the individual cities of Beaverton, Hillsboro, and Tigard, each of which has its own building department for properties inside city limits. The same statewide Oregon framework applies: a CCB-registered contractor typically pulls the permit for hired work, and an owner-builder exemption exists for a qualifying owner who wants to pull it themselves. Which office you file with comes down to whether your address sits inside an incorporated city boundary.

Vancouver, WA & Clark County: the one real difference

Washington state runs this differently than Oregon. The City of Vancouver's Commercial, Multi-Family and Industrial (CMI) application (revised July 2026), which its tenant improvement checklist requires signed and dated, has separate sections for the contractor (with a WA State License number), the owner, and the electronic plans submitter. Under "Required Signatures" it asks for both the applicant's signature and the property owner's signature, so the owner signs even when a contractor applies. Washington contractors are registered with L&I rather than licensed by Oregon's CCB, which is worth knowing if you own property on both sides of the Columbia River.

Journey Church, a Modern Northwest project in Camas, WA, permitted through Clark County
Journey Church in Camas, WA, a Modern Northwest project on the Washington side of the Columbia, where Clark County's permitting rules differ from Oregon's.

Already have an address and a scope in mind? Send us the details and we will tell you exactly what your jurisdiction's application will ask for.

What happens if the permit gets pulled wrong

Filing under the wrong applicant, or starting work before approval, is a common and avoidable way a commercial build-out loses time. A permit filed for the wrong scope of work gets sent back for correction, and that delay lands on your commercial timeline. This is one of the reasons a commercial construction contractor experienced in your specific jurisdiction is worth having involved before the application goes in, even on projects where the owner is technically the applicant.

Jurisdiction comparison

JurisdictionWho typically appliesContractor registration required?Note
City of PortlandContractor or ownerYes, for hired work (CCB #)"Owner doing work" option if self-performing
Unincorporated Multnomah CountyContractor or ownerYes, for hired work (CCB #)County permits only outside city limits
Washington County (unincorporated)Contractor or ownerYes, for hired work (CCB #)Separate from Beaverton/Hillsboro/Tigard city permitting
City of Vancouver, WAContractor or ownerForm has a contractor section with WA State License #Property owner signature listed under "Required Signatures"

Not sure what your jurisdiction needs? Tell us your address and scope, we'll tell you exactly what the application will ask for before you file anything. Book a Free Walkthrough, or call (360) 326-2747.

Frequently asked questions

Does a commercial tenant need their own permit for a build-out, or does the landlord handle it?

It depends on the lease and the scope of work, but the permit itself is tied to the property, not the tenancy. Whoever is named as the applicant, the tenant's contractor, the landlord, or the landlord's contractor, is who the jurisdiction will contact. This should be settled in the lease's tenant improvement clause before design work starts.

Can a property owner in Oregon really pull a commercial permit without a licensed contractor?

Yes, under the owner exemptions in ORS 701.010, but they come with real conditions and real liability the owner takes on directly. Many commercial property owners still hire a CCB-licensed general contractor specifically because the GC absorbs that coordination and liability.

Does starting work before a permit is approved actually get caught?

Oregon's building code requires the permit or a copy to be kept on the job site until the project is complete (OSSC 105.7), and work has to stay visible and accessible until it is inspected and approved. If it is covered first, the code says the building official is not liable for the cost of removing material to allow the inspection (OSSC 110.1).

Is Beaverton's process different from Portland's?

Not in the underlying rule, both run on the same Oregon CCB framework, but they're two separate building departments (Washington County or the City of Beaverton itself, versus City of Portland), so you file with a different office depending on the address.

Is the process different for a tenant improvement versus new ground-up construction?

The applicant question works the same way. Review time depends on the scope and the jurisdiction, so check the current review timelines for your city or county before you set an opening date.

Does Vancouver, WA require the same CCB number Oregon does?

No. Washington uses its own state contractor registration system, separate from Oregon's CCB, Vancouver's commercial application asks for the contractor's WA State License number and lists both the applicant's and the property owner's signatures as required.

Building across Portland, Beaverton, Vancouver WA, and beyond

Modern Northwest has pulled permits as both the general contractor of record and alongside ownership-led applications, across Portland, unincorporated Multnomah County, Washington County, and Vancouver, WA. If you're planning a tenant improvement, ground-up build, or repositioning project anywhere in the Portland-Vancouver metro, we can tell you exactly what your specific jurisdiction will ask for before you file anything.

One thing to plan for if you are building a clinic: healthcare spaces carry review beyond the standard building permit. Imaging rooms get their own shielding review alongside the main application, and state health department requirements can land on top of the local building department's. That applies to dental and medical build-outs and to veterinary clinics alike. Worth knowing before you commit to a schedule, because those reviews run alongside the permit rather than after it.

Plan review is also where the examiner checks your occupant load against the required fixture count, so if your space is short a restroom, this is when you find out. Our guide to how many bathrooms a commercial building needs covers the Oregon numbers so you can run that math before you file.

Serving: Portland, OR (Multnomah County) · Beaverton, OR (Washington County) · Vancouver, WA (Clark County) · the rest of Oregon and Southwest Washington

Ready to start your commercial project?

Call (360) 326-2747 or reach out online, we'll tell you exactly what your jurisdiction needs before you file anything.

Get a free estimate

Tell us about the space. Size and timeline are optional.

Call UsFree Estimate